DBL Churhat Bypass Tunnel - Rewa-Sidhi section of NH 75E
DBL undertakes Construction of Chrhat Bypass including Tunnel on Riwa Sidhi section of NH 75E from chainage 33.200 to chainage 55.400 (design length 15.350km.) in the state of MP on Hybrid annuity Mode”.